FIG. 06 — PROJECT ARCHIVE

The Proof, Frame by Frame.

A working record of completed structures — filter by type to see the scale and complexity we take on. Click any photo to open the full gallery.

Muskoka Lakes project VIEW GALLERY

Muskoka Lakes

LOCATIONMuskoka, ON DURATION11 weeks SQUARE FEET6,000 sq ft COMPLEXITY★★★★★
Boat House - Muskoka project VIEW GALLERY

Boat House - Muskoka

LOCATIONMuskoka, ON DURATION8 weeks SQUARE FEET2,100 sq ft COMPLEXITY★★★★☆

FIG. 07 — HOW A FRAME COMES TOGETHER

From Blueprints to Backfill.

Click any stage to see where your project stands in the sequence.

STAGE 01

Blueprints & Estimating

Architectural drawings are reviewed, cut lists are shop-drawn, and a fixed framing estimate with a firm schedule is issued.

STAGE 02

Material Staging & Layout

Lumber packages are staged on-site, sill plates are laser-checked against the foundation survey, and wall layout is chalked.

STAGE 03

Floor, Wall & Roof Framing

Crews frame floor systems, walls, and roof structure in sequence, with engineering sign-off at every load-bearing milestone.

STAGE 04

Sheathing & Weatherproofing

Structural sheathing, house wrap, and temporary bracing go on, locking the frame square and closing it to the weather.

STAGE 05

Backfill & Final Inspection

The frame is walked with the building inspector and the general contractor, punch items closed out, and the site handed off clean.

See something close to your project? Let's scope it.